ZF Hydraulic & Pneumatic parts Co., Ltd

ZF Hydraulic & Pneumatic parts Co., Ltd

进入中文版  中文版 进入英文版  ENGLISH
Contact Us

Name: Mr William
Tel: 86-135-09210189
Fax: +86-0755-66813786
Mobile: +86-13509210189
E-mail: zfhydraulic@hotmail.com
E-mail: sales@zfhydraulic.com
Add: 4/F, Bldg. 3, Anhua Industrial Zone, Area 35, Xin'an St., Baoan Dist, Shenzhen, Guangdong Province, China
Skype: zfhydraulic
MSN: zfhydraulic@hotmail.com
QQ: 2542600020
MSN: zfhydraulic@hotmail.com Skype: zfhydraulic QQ: 2542600020

what preparation work to do before Cleaning the cooler

Author : Xiong Date : 8/2/2014 11:44:35 AM
what preparation work to do before Cleaning the cooler

Cooler need to wash up after using for a period of time, improve the performance of the equipment, prolong service life.But cleaning should pay attention to many aspects of the cooler, what preparation work should be done before the first clean the cooler?
1) understand the structure size of the cooler.Material, capacity, performance, medium, process conditions, scope of application and cleaning, etc., have to check the equipment without deformation, jams, leakage and other anomalies.
2) depending on the degree of corrosion fouling equipment to choose the right means of cleaning fluid or clean.
3) to examine the utility conditions, such as water, electricity use is convenient, contact position and distance pumping station distance.
4) to clear liquid waste processing requirement and discharge location.
5) cleaning the presence of crossover operation, the ground condition, the lighting situation, specific positions for the cleaning pump station and the raw material.
6) according to the cleaning method to choose the appropriate cleaning tools, the tools will be ready.
7) for the design of cleaning system.According to the specific situation, separates be cleaning parts and other parts;Looking for the right cleaning jing temporary import and export and the design of drainage outlet connection line and monitoring line.
8) to determine the cleaning method and the tools needed for later, will need cleaning equipment and cleaning agents, chemicals, analysis of monitoring instruments, operating tools and relevant equipment ready.

The above: Internal meshing high pressure gear pump